The Annual Critical Power Thermal Report — the same independent documentation True South delivers for hospitals, scoped to your surgery center: generator, transfer switches, panels, critical distribution. Typically completed in a half-day visit. One clean PDF for the survey binder.
Independent FLIR thermal documentation for ambulatory surgery centers across Georgia, Florida, Alabama, South Carolina, and Tennessee.
Ambulatory surgery centers run lean by design — a full procedure schedule, a small facilities footprint, and the same documentation expectations as facilities ten times their size. Accreditation surveys and CMS reviews ask about the condition and maintenance record of emergency power and electrical systems.
Your generator test logs answer part of the question. What they don't show is the thermal condition of the transfer switches, the panels, and the distribution that carries every procedure day's load.
And since the 2023 edition, NFPA 70B — the electrical equipment maintenance standard your insurance carrier references — calls for infrared inspection of electrical equipment on at least an annual cycle. What that means for your center is your compliance team's call. Documenting it cleanly is ours.
Until the record is requested.
True South is the independent documentation layer between service work and survey readiness — scheduled around your procedure calendar, completed in half a day, gone before it ever slowed the center down.
An ASC's critical power footprint is compact and well-defined — which is exactly why the engagement is fast without cutting corners. Scheduled around your procedure calendar.
True South documents visible and accessible conditions at time of visit using radiometric thermal imaging.
This is not electrical testing, engineering assessment, code inspection, repair estimation, certification, commissioning, or corrective-action recommendation.
That boundary is not a limitation. It is the reason the report has value — it stays focused on documented condition without crossing into work your own qualified personnel and licensed contractors are responsible for.
Accreditation surveys and CMS Conditions for Coverage reviews routinely examine emergency power and physical environment documentation at surgery centers, and insurance carriers increasingly reference NFPA 70B — which, since its 2023 edition, is a standard calling for infrared inspection of electrical equipment on at least an annual cycle. What applies to your center is your compliance team's determination. True South provides the independent documentation.
Most surgery centers are documented in a single half-day visit, scheduled around your procedure calendar — early morning, a non-procedure day, or whatever window keeps the center running undisturbed. The compact critical power footprint of an ASC is what makes the engagement fast without cutting coverage.
No. True South performs observation-only thermal documentation — no testing, no certification, no diagnosis, no repair recommendation. The deliverable is an independent field record of observed thermal condition. Testing, engineering evaluation, and corrective work remain with your qualified personnel and licensed contractors.
A short scope conversation, a flat project fee quoted before any work begins, and a half-day visit scheduled around your procedure calendar. Then the record exists.